Every construction project requires proper planning and cost estimation. When estimating costs for a construction project, it is easy to overlook intangible costs. Naturally, you pay more attention to physical project elements like materials, labor cost, landscape cost, etc. However, there is another category of costs that you ought not to overlook; soft costs in construction.
Creating a detailed budget is the key to the success of any construction project. It starts by carefully reviewing the project plans to determine the amount of work that needs to be done. Knowing what soft costs are and how they differ from hard costs will help.
In order to create a detailed and realistic budget, I’ll provide a comprehensive overview of hard and soft costs in construction. I will also highlight key differences between the two and how they both impact a construction project. So, without taking too much of your time, let’s go into more detail about soft costs in construction.
Introduction
In construction, it is not easy to accurately estimate project costs, especially with fluctuating prices. There are many variables to consider but you still have to come up with an estimate. One of the most effective techniques is to define or highlight the costs of the project. Construction costs are practically divided into two categories, soft costs and hard costs. Both are integral to the completion of any construction project so it only makes sense to understand both.
What are hard costs in construction?
For you to better understand what soft costs are in construction, you must first know the basics about hard costs. Basically, hard costs in construction are costs that are directly associated with the construction of a building or structure.
These costs take up the majority of the project budget and are generally easier to estimate when compared to its counterpart, soft costs. They are tangible and revolve mostly around labor costs, materials, and landscape costs.
Although the cost of labor, material, and landscape are not fixed or set in stone, they are less likely to change drastically. Even when they do change drastically, a contractor’s estimate would not fall too far, and they can be addressed with the budget.
Examples of hard costs in construction
As I cited earlier, hard costs are costs that are directly associated with the actual building in question. These can include;
- Material to be used for the project: This includes but is not limited to; wood, metal, glue, sidings, roofing, screws, nails, concrete, glass, and other related building materials.
- Construction labor costs: This includes the salary of all workers or staff that will be hired and play a role in the construction of the building.
- HVAC system and utility installation: This includes the costs for paving, grading, heating, ventilation, electrical, plumbing, and all other systems or utility installations that have to be done on the site.
- Safety systems and structures: This includes the cost of all sprinklers, fire escapes, alarm systems, drainage systems, etc, that will be installed.
- Interior and exterior finishing: This includes the costs for all finishing touches carried out on the building. For example; paint, countertops installation, flooring installation, trims, wallpaper installation, and other finishing works.
- Landscaping costs: This includes the cost of removing trees, flowers, bushes, rocks, or other structures that are not included in the building plans. It also includes the cost of site improvement carried out on the site. This includes; planting flowers, fixing benches, and other landscaping elements to improve the aesthetics of the site.
Factors that can influence your hard cost estimates
Several factors can impact or influence your hard cost estimate for a project, they include;
1. Fluctuation in the supply chain
Several factors like inflation and other global events can affect the costs of material and labor. For example, the price of steel skyrocketed during the COVID-19 pandemic, unfortunately, the price still remains significantly high to date.
2. Geographical location
The location of the building can also influence your hard cost estimate for your project. For example, buildings in areas that experience colder climates may require more insulation or at least a dependable roofing system to withstand heavy snow and ice.
Those buildings in areas with warmer or hotter climates, like Florida will spend less on insulation or roofing when compared to those in colder regions.
3. Change in project scope
Your hard cost estimate can also be influenced if a project has passed the design stage and the client or homeowner requests a change or two. These changes depending on their nature, might influence the estimated budget for the project.
What are soft costs in construction?
In construction, soft costs are costs that are not directly tied to the physical construction of a project but are still very important. Most of these costs are not tangible, such as permit fees, services, and insurance, but they play a crucial role in bringing the overall project to fruition.
Soft costs are incurred from the planning stage of a project cycle to post-occupancy and beyond. As you can imagine, these intangible costs can prove to be more difficult during budget estimation.
Example of soft costs in construction
Soft costs for construction projects may differ depending on the project scope. Here are some examples of soft costs found in construction projects.
- Architectural, design, and studies fees: This includes, but is not limited to feasibility studies, testing consultation, architectural fees, engineering fees, and health & safety inspection that will be conducted on the worksite.
- Land, permit, and survey fees: This includes all land and real estate development costs, appraisal fees, land acquisition fees, land assessment fees, and land survey fees that are to be paid to local governments.
- Rental, equipment, and tools: This includes all fees to be paid for tools and equipment (radio for communication, office trailer, and other types of equipment needed at the worksite).
- Loans, accounting, finance, and insurance fees: This category covers loan-generated interest and bank transaction fees. It also includes other accounting expenses like performance bond fees as well as construction loan commitment fees and broker fees.
- Project management costs and taxes: This includes all expenses on staff compensation related to security and safety and then all related taxes to local and state agencies.
Hard costs Vs soft costs – Key differences between the two
When the decision to build, remodel, or expand is made, thought first goes toward tangible elements of the project. It is easy to focus on the hard costs since that is basically what brings your vision to life, soft costs are secondary or simply a complete afterthought.
Nevertheless, it doesn’t change the fact that both hard and soft costs are very important. In this section, I aim to give you a clear understanding of what both costs entail and how they differ.
1. Nature of expense
Hard cost expenses border on the physical or tangible aspects of the construction project. This includes; material, labor, landscape, HVAC and utility installation, and other direct construction-related expenses. These expenses later become evident in the finished project and contribute directly to its functionality and aesthetics.
Soft costs on the other hand border on intangible expenses that are still crucial to the completion of a construction project. This includes expenses related to planning, design, permits, and other legal and administrative costs. These expenses do not physically manifest in the final construction but are essential for project development.
2. Timing of the expense
Hard costs are usually incurred during the construction process, or at least during the early stages of construction. Soft costs, however, can be incurred before and during construction, and in some cases even after the construction is finished (post-construction).
Soft costs are often spread out across a project’s duration. Pre-construction costs include design, planning, and permitting fees, during construction soft costs include, legal and administrative fees, and post-construction costs often include taxes and insurance fees.
3. Estimation difficulty
Hard costs are usually easier to estimate because contractors already have ideas on the current price of material, labor, etc. Even if prices are higher than expected, chances are the overall cost will still be within the estimated budget.
With soft costs, it is a different ball game entirely. Soft costs vary according to location and the complexity of the project. This means that estimating soft cost amount tend to be way more tricky than that of hard costs.
The importance of soft cost estimation and budgeting
Budgeting and cost estimation, whether for soft costs or hard costs is pivotal to construction project management. Accurate and effective budgeting not only ensures the financial health of a project but also contributes to the overall success of the project.
Misjudging soft costs can disrupt a project’s viability and financial performance, leading to cost overruns and delays in construction. In order to prevent this, proper planning and occasional review can help mitigate this risk.
In the next section, I will explore some of the best practices for managing and controlling soft costs in construction.
Best practices for managing and controlling soft costs in construction
Inaccurate or improper management of soft costs can have cascading effects on a project. This section highlights the best practices to ensure your project stays on track operationally and financially.
1. Plan with the right team
Meticulous planning is the foundation of a successful project. Ensure you plan with the right team or contractor for your project. Ask questions about their previous clients, problems encountered, and how they handled these problems. This should give you an idea if you are working with the right team.
2. Expect the unexpected
While it is relatively simple to calculate the amount to be spent on wood, steel, or other building materials, soft costs are not that straightforward. It is hard to predict how many feasibility studies will be necessary for the project and how much will be spent. The same can be said about the permit fees and how long it would take.
Extra time and finance must be allocated specifically for soft costs-related expenditures. This way, you are well prepared for any and all financial intricacies before and during the project life cycle.
3. Foster a transparent relationship
You should also foster an open and transparent relationship among all stakeholders, contractors, subcontractors, and team members for the project. Encourage them to report any potential issues promptly, early identification and communication allow decision-making and budget adjustment to be timely.
FAQs
What is another name for soft costs?
In construction soft costs are also referred to as indirect costs.
Soft cost accounts for how many percent of a project’s budget?
Soft costs can account for 20 % – 35% of a project’s budget depending on the complexity of the project.
Can soft costs be avoided?
No, they can’t. Every project whether big or small has soft costs associated with it and cannot be avoided.
At what stage in construction do soft costs arise?
Soft costs may arise at any stage in the construction cycle; before, during, and after. Before includes; permit and feasibility test, during includes; legal and administrative fees, and after includes; taxes and insurance.
In conclusion – Effectively managing soft costs in construction
Soft costs are often overshadowed by tangible or hard costs like material, labor, and landscaping during construction, but they play a pivotal role in bringing your dream home to life. These costs are not directly spent on the building like hard costs are but they encompass indirect and administrative expenses that are even more significant.
That said, if soft costs for a project are not managed or controlled properly, it can have a cascading effect on the project. This is why it is important you work with a professional who can anticipate challenges and costs that may not be obvious at the beginning.
Additionally, remember that it is almost impossible to perfectly predict soft costs for a project. Therefore, it is a smart move to leave some room in your budget for flexibility.
Lastly, remember to foster open communication channels among all parties involved in the construction project. This way, all parties can report any potential issues that may incur more soft costs to enable timely decision-making and budget adjustments.
I hope you found this article helpful, you might also be interested in this article on “Understanding Construction Build Time & Factors Causing Delay“.
Thanks for reading.